3M 08115 Panel Bonding Adhesive 200 mL Duo Pack Epoxy Cartridge, 24 hr Curing
- The 3M 08115 is a two-part epoxy panel bonding adhesive designed for non-structural outer body panels such as door skins, roof skins, quarter panels, box sides and similar; it bonds steel, aluminum, SMC, and FRP with high performance.
- Features:
- Contains glass beads for bond line thickness control, helping avoid excessive squeeze-out and ensuring consistent adhesive layer
- Extended work time (approximately 90 minutes) allows placement, alignment, and clamping before cure begins
- Can be heat-accelerated for faster strength development when needed
- Corrosion-inhibiting formula helps protect joints from environmental damage
- Specifications
- Part No.: 8115
- Product Line: MMM
- MFR Model: 08115
- Standard/Approvals: California PROP65 Warning: Cancer and Reproductive Harm | OSHA 29 CFR 1910.1200
- Applications: For door hem flanges, door skins, floor pans, metal bonding and metal to composite bonding
- Manufacturer: 3M Products
- Alternate Part Number-1: 60980030930
- UPC: 051135081150
- Brand: 3M
- Applicable Materials: Steel, Aluminum, SMC/Fiberglass
- Application Time: 90 min
- Specific Gravity: 1.2
- Color: Black
- Container Size (mL): 200
- Setting Time: 4 hr
- Flash Point: 110 deg C
- Container Type: Cartridge
- Form: Viscous Liquid
- Temperature Rating (deg F): 70
- Type: 2-Part
- Curing Time: 24 h
- The 3M 08115 Panel Bonding Adhesive may also be referred to as 3M panel bond epoxy 08115, automotive panel bonding adhesive, two-part epoxy cartridge, non-structural body panel adhesive, and 3M outer skin adhesive 08115.
3M 08115 Panel Bonding Adhesive is a premium epoxy adhesive developed for body shops. It delivers excellent adhesion and corrosion resistance for outer body panels while allowing flexible working time and heat-curing on demand to match shop throughput and restore vehicle structural integrity where permitted.
Q: Can 08115 be used on structural parts like pillars or frame members?
A: No. It is intended for non-structural outer panels. Structural components should be repaired or replaced following manufacturer’s structural adhesives or welding procedures.
Q: What surface preparation is needed for best performance?
A: Surfaces must be cleaned to bare metal, all rust, paint, and primer removed; abrasive tools (e.g. P80 or similar) used; solvent wiped. Proper fit and clamping are crucial before application.
Q: How long after application can parts be handled or returned to normal use?
A: After approximately 4 hours clamp time at 23°C, parts can be handled carefully. Full strength is achieved after about 24 hours under ambient conditions; cure can be accelerated with heat if needed.